sisHYD User Guide

Create Supply

Serves the construction of servicers including the network pumps in the station on the servicers pre and/or return page.

The common function adjustments are described under Function Adjustments.

  • Pump – Together with a supplier the pumps in the station can be created. The following possibilities are available:
    • Without – Creates a supply.
    • With advance pump – Creates a supply with advance pump.
    • With return pump – Creates a supply with return pump.
    • With advance and return – Creates a supply with return advance and return.

➤ In order to create a new supply, you must carry out the following steps:

  1. Click Create Supply (sisHYD > Tools > Construction).
  2. Click on the nodes onto which the supply is to be installed.
Note: For long-distance heating and remote cooling networks is the node is selectable only if it exists in advance and return or in the KLB and return. Otherwise, a prohibition character is displayed. The tool hint describes the cause of the refusal. In long-distance heating three-conductor networks an advance or a KLB node must be selected, since the return node results automatically.
Note: With installation with pumps sisHYD the necessary nodes create between a suppliers and pump. As node name the name the link nodes extended by the appendage „of the P is assigned", if name is not already assigned.

See configuration dialogs Supplies and Pumps.